Bathrooms, turnkey.
From strip-out to the last bead of silicone. One team on site, one clear quote, and a bathroom built to cope with daily showers for years.
- Waterproofing under every shower before a tile goes down
- Walk-in showers, niches and level-access trays
- Zellige, large-format porcelain and natural stone
- Plumbing and electrics coordinated by us

What's included.
Waterproofing
A membrane under showers and wet zones, with taped corners and junctions.
Tiling
Setting-out so cuts land where they look right, then tiling, grouting and trims.
First-fix plumbing
New supply and waste runs where the layout changes.
Electrics
Lighting, extractor and sockets moved or added, coordinated with the tiling.
Fit-out
Shower trays, screens, vanities, WCs and taps installed and sealed.
Protection & clean-up
Floors and furniture protected, and the site tidied every day.
How a bathroom comes together.
- Phase 1
Strip-out
Protection, demolition and waste removed.
- Phase 2
First fix
Drainage, water supply and electrics moved.
- Phase 3
Prep & seal
Screed, boards and waterproofing, left to cure.
- Phase 4
Tiling
Setting-out, tiling, grouting and trims.
- Phase 5
Fit & hand over
Sanitaryware, glass, a deep clean and a walkthrough.
Recent work.
Bathrooms · FAQ
How long does a bathroom renovation take?
Most full bathrooms take two to three weeks on site. Our Marbella master bathroom took 14 days. The free site visit tells us what's under the old tiles, which is what usually decides the timeline.
Is the site visit really free?
Yes. We come out the same week to measure and look at the existing bathroom. There's no obligation.
Can I keep living in the house during the works?
Usually yes. Expect noise and some dust during the strip-out days. We protect floors and furniture, and tidy up at the end of each day.
Do I need a permit?
Most bathroom renovations count as minor works and need a permit or a declaration at your ayuntamiento. The requirements vary by town, so we'll go through what applies at the site visit.
Can you work with tiles I've already chosen?
Tell us what you have in mind at the site visit and we'll plan the layout and quantities around it.